Wednesday, October 30, 2019

BIM (BUILDING Information Modeling ) Essay Example | Topics and Well Written Essays - 1500 words

BIM (BUILDING Information Modeling ) - Essay Example The two kinds of BIM software are authoring software and coordination software (Solibri, n.p). BIM process involves building design that require collaboration through computer models and not disjoints drawing sets. Through the use of BIM, digital representations of buildings are made available and used for decision making, first class production of construction documents, building planning, and predictions of performance and cost estimates (Solibri, n.p). BIM is employed in modeling and not drawing (Solibri, n.p). Modeling permits the designers to see the building and its parts from numerous angles. In addition, clash detection in the design phase allows designers to identify faults and correct them prior to commencement the building (McNell, 9). Early errors detection implies that costs involved in on-site correction are eliminated. Coordination is emphasized and facilitated by BIM through the use of a data repository where team members easily access information to confirm questiona ble aspects like building elements’ compatibility with the rest of the building. Through BIM cloud, BIM models by different team members can easily be viewed and edited and the consequences of each action made accessible to all model users (McNell 9). BIM is used to provide precise inclusion and modeling of prices and upgrading of bids and project pricing accuracy. Through the visualization designs, clients can verify design intention and sharedknowledge through virtual design and construction then strengthens client’s satisfaction. 2.0. BIM management Although BIM reinforces construction team members’ collaboration through the use of a shared information database to create a virtual model, there is heated debate over the management of BIM (AUGI, n.p). The ownership of BIM is left to DDC or the department of Design and construction. The model ownership is extended to include all inventions, designs, ideas, and methods contained inside the model. DDC reveals that peripheral users like contractors and consultants are only granted short lived use of BIM which terminates with the completion of the project and all copies of BIM copies have to be returned to DDC (AUGI, n.p). Basically, the project models contained in BIM from pre-conception to completion belong to DDC while project team owns just the idea. BIM teams include architects, designers, engineers and contractors and owners. The owner submits his or her request for service to the architect (AUGI, n.p). The architect then validates the request before designing the building. The architect provides the engineer with the building model and the engineer then uses computer aided design 3D visualization and modeling through Revit and creates 3D design or imports ordinary 2D drawings that have 3D information to establish perfect renderings from 3D (McNell, 15). Using BIM, designers investigate substitute notions; carry out value engineering and come up with finest designs. The contractors then revise the documented construction before commencement of physical construction. From the model, project owners are then involved in project aspects since they gain immediate and vast information which is formatted to satisfy their needs. 3.0. BIM practice BIM process involves four main stages which are design, build, operation and maintenance. The BIM model life cycle begins with the request from the owners. At first, the owners do not have sufficient information on what the final product will have (Eastman, Teicholz, Sacks and Liston,

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.